v2 archive
Earlier-draft material from April 12, 2026. Superseded by the current plan. Preserved here for reference only — these documents do not describe how Legacy Soil & Stone operates today.
v2 deliverables
-
v2 Master Proposal
April 12 train-of-thought version. Pet-only Stream A model with cremains-volume-coupled product sizes.
-
v2 Investment Prospectus
Reference only. The current plan is informational, not a fundraising pitch — no outside capital is being solicited.
v2 research (superseded)
-
Concrete Mix Recipes (v2)
Pearls used as aggregate in cast concrete products. Concrete is no longer part of the plan.
-
Decorative Concrete Methods (v2)
Pour techniques, GFRC, surface finish for the v2 concrete line. Not part of the current plan.
-
Customer Intake Form (v2)
Pet/human branching intake form keyed to the v2 flat catalog. The current intake form is rebuilt against the current Stream A / Stream B / Line 3 catalog.
-
Line One Process (v2)
Granulation, casting, cure schedule for the v2 concrete-cast Line One. Superseded by the current Pearl Method process.
-
Line One Financial Analysis (v2)
v2 COGS, intake fees, margin per cast-concrete product. Superseded by the current Stream A unit economics.
-
Decision Closures — April 2026
v2 working document of decisions taken during the April rebuild.
-
Debate Prompt
v2 internal debate prompt for stress-testing the proposal.
-
Claude Analysis
v2 working analysis document.
-
Creative Solutions
v2 brainstorm document. Useful ideas have been folded into the current plan; the rest is preserved here.